Lesson 21: Sizing Considerations for Earthen Manure Storage Systems

Regulatory Compliance Assessment:

Name of Operation:
Date:

Regulatory Issue Is this issue addressed by regulations? Is my livestock/poultry operation in compliance?
Specific storage period or size required?
Yes No

If Yes, summarize:

Yes No
Not Applicable
Don't Know
Specific depth above maximum level for start pumping required?
Yes No

If Yes, summarize:

Yes No
Not Applicable
Don't Know
Sludge volume component required?
Yes No

If Yes, summarize:

Yes No
Not Applicable
Don't Know
Permanent volume required to maintain a wetted seal?
Yes No

If Yes, summarize:

Yes No
Not Applicable
Don't Know
Allowance for open lot runoff control?
Yes No

If Yes, summarize:

Yes No
Not Applicable
Don't Know
Maximum loading rate required for a permanent treatment volume (anaerobic lagoon only)?
Yes No

If Yes, summarize:

Yes No
Not Applicable
Don't Know
Volume for a specific storm event (e.g., 25-yr, 24-hr storm)?
Yes No

If Yes, summarize:

Yes No
Not Applicable
Don't Know
Volume for chronic wet years (e.g., wettest year in 10 yrs)?
Yes No

If Yes, summarize:

Yes No
Not Applicable
Don't Know

Back to National Curriculum